There will be a special test of our tornado sirens Saturday 6/8/19 at noon. Test to run for approximately 1 minute.
Starting June 19th - First 2 weeks of August, US 41 bridge near 600 block addresses, near La Caretta/Home Depot, will be one lane each way for repairs.
Sign your child up to learn more about law enforcement.
Schererville is seeking applicants for an opening on the Board of Safety.
213th & Eagle Ridge Dr. between Calumet Ave. and Willowbrook is closed to thru traffic due to flooding. Local traffic must enter via Calumet.
Live Music, Beer Garden, Food Booths, Rides, Games, and More!
Paving to begin 5/28/19 on 77th Ave. from St. John Rd-Us 41, 77th from St. John Rd-Howard Castle Dr., St. John Rd from 77th-Hillcrest Dr.
There will be a Plan Commission Study session May 20, 2019 to discuss Burr St. from south of US 30 to 91st.
James Wittchen Dr. is currently flooded at the Turkey Creek Crossing near Cline Ave. Please find an alternate route to get around it.
77th Ave. is scheduled for bridge and road resurfacing, between U.S. 41 & St. John Road. Starts 5/6/19 and continue for 4-6 weeks. Please click to read more.
Phone: 219-322-2211