U.S. 30 to have lane closures between state line and U.S. 41
LAKE COUNTY, Ind. - Indiana Department of Transportation contractor Superior Construction Co Inc will have lane closures on U.S. 30 between the Illinois State Line and U.S. 41 beginning on or after Monday, April 15.
This is a concrete restoration project, with full depth patching and joint repairs. There will also be a preventative maintenance bridge deck overlay done on the Plum Creek bridge between Hart St and Moeller St.
Work will be ongoing through mid-May, with alternating lane closures and changing traffic patterns. During phase one, the left passing lane and left turn lanes will be closed in both directions.
INDOT encourages drivers to allow extra time when driving through this area and follow traffic directions carefully. Motorists should slow down, exercise caution and drive distraction-free through all work zones.